If you live in Carmichael, Fair Oaks, Antelope or Wilton, your ADU is permitted by Sacramento County, not by the City of Sacramento. These communities are unincorporated, so the County sets the zoning rules, issues the building permit and does the inspections. That matters more than usual right now, because on October 22, 2026 the County dropped its own ADU ordinance and started applying state ADU law directly. For rural lots, especially around Wilton, it also changed what you can build.

This guide explains how an ADU in Sacramento County's unincorporated communities works in late 2026, and which local agencies you will deal with along the way. Rules change, so confirm the details for your parcel before you design.

ADU rules in unincorporated Sacramento County after October 2026

The County repealed its ADU ordinance so that it simply defers to state law. In its place, the County publishes plain-language ADU and JADU Guidelines (Appendix A of its Zoning Code User Guide), which restate state ADU law as the County applies it. Where the two ever disagree, state law wins.

For a homeowner, this has three effects. First, approval is ministerial: the County reviews an ADU only through the building permit, with no public hearing. The trade-off: no exceptions, so a design that misses a standard has to change. Second, the state clock applies: under Government Code 66317, a complete ADU application on a lot that already has a house must be approved or denied within 60 days, or it is deemed approved. Third, your zoning decides whether you can have an ADU at all. ADUs are allowed in residential and mixed-use zones, while agricultural lots now follow a different set of rules, covered further down.

What you can build on a typical residential lot

Most homes in Carmichael, Fair Oaks and Antelope sit on residential lots. You can add up to three units: a new backyard cottage, a junior unit (JADU) inside the house, and one more unit that is either an addition to the house or a conversion of existing space, such as a spare wing or a detached garage.

The backyard cottage is the most flexible option. It can be up to 1,200 sq ft, so a family-size two or three bedroom layout fits; the County's own three-bedroom plan is 1,184 sq ft. An addition to the house is sized in proportion to your home, with a minimum allowance large enough for a one or two bedroom unit. A conversion simply reuses the space you already have.

A JADU suits owners who want to stay in the main house and rent a room-size suite or house a relative. It can be up to 500 sq ft inside the home or an attached garage, with its own outside door, and it may share a bathroom with the house only if the owner lives there and records a deed restriction. One classification rule to keep in mind: the second unit cannot be bigger than the main home. If you build a new house larger than the existing one, the new house becomes the primary home and the old one becomes the ADU.

Height, setbacks and parking

Setbacks for a new unit are small. A new backyard unit only has to stay 4 feet from the side and rear property lines. Smaller units get extra room to work with: a new unit of 800 sq ft or less needs no front setback, while a larger one keeps the normal front setback for a house in that zone. The one thing setbacks never override is a recorded public easement; the unit has to stay out of it.

Height is the main design limit. A detached cottage can be 16 feet to the peak, which suits a one-story home with a pitched roof; if you want a taller roof to match your house, the County allows a bit more when you show both roof pitches. If you are hoping for a second story, an attached unit is the route to look at, since it can reach 25 feet (or the main home's height limit, if lower). Parking is a small issue: only a new detached unit over 800 sq ft needs a space, and even that is waived near transit or when the unit replaces a garage.

One rule that affects rental plans: a County ADU cannot be rented for 30 days or less unless it was legally permitted before January 1, 2020, and a JADU can never be a short-term rental.

Wilton and other agricultural lots: the Agricultural Accessory Dwelling

This is the biggest change for rural owners. The County guidelines say it directly: ADUs and JADUs are not allowed in the Agricultural-Residential (AR) or Agricultural (AG) zones, because those are not residential or mixed-use zones. Instead, the Zoning Code now offers a separate kind of second home called an Agricultural Accessory Dwelling, or AAD.

The County zoning map shows the Wilton area zoned agricultural and agricultural-residential, so for most Wilton parcels the AAD is the option to look at. Some Fair Oaks and Antelope parcels are zoned AR-1 or AR-2 too, so check your zone.

For a rural owner, the AAD is in some ways more generous than an ADU. You can build two detached homes by right next to the main house, each up to 1,200 sq ft, which is room for parents, a grown child or a ranch hand. The limits are on shape rather than count: each AAD must be one story and no taller than 20 feet, and never larger than the main home. A bigger or two-story AAD is possible, but it needs an extra County approval called a Minor Special Development Permit.

Two differences from an ADU matter for planning. An AAD follows the same setbacks as the main home in that zone, not the 4-foot ADU setbacks, so it may need to sit further from the property lines. And it cannot be a short-term rental (a farm stay needs a Conditional Use Permit). If you already have a permitted ADU on an AR or AG lot, the County now treats it as an AAD, and any expansion follows the AAD rules.

The code says an AAD is not an ADU, so do not assume ADU allowances such as the fee exemptions below carry over; ask the County for a written fee estimate before you budget.

The County's free Shelf Ready ADU plans

Sacramento County offers a set of free, pre-checked detached ADU plans called Shelf Ready ADU Plans, funded by a state LEAP grant. They can only be used in unincorporated Sacramento County. There are five models: two 460 sq ft studio or one-bedroom units (Laurel and Willow), an 870 sq ft two-bedroom (Redwood), a 1,000 sq ft two-bedroom (Elderberry) and a 1,184 sq ft three-bedroom (Magnolia).

The program saves design time, with conditions: you still prepare a scaled plot plan, the three larger models need separately permitted solar (PV) plans, the plans cannot be modified beyond the listed options, and the plans still go to the local fire agency for review. Standard building fees apply, and ADUs over 750 sq ft pay impact fees. The sets were plan checked to the 2022 California codes, so ask the County whether anything changes under the current code. The County also notes the plans may not fit every parcel because of setback and firewall requirements.

If you want a different layout, browse these ADU models; a custom design goes through the same County building permit.

The County permit path, step by step

Start by confirming your parcel's zone and jurisdiction (see the last section), then check the site: setbacks, easements, sewer or septic, water source and flood zone; the County takes setback questions at SacPlan@SacCounty.gov. Prepare plans, custom or Shelf Ready, with a scaled plot plan showing every structure, easement and utility line. Then apply for the building permit online through the County's Citizen Access Portal. Other agencies sign off along the way: EMD if the lot is on septic, the school district, and the fire agency where it reviews the plans. Converting a garage, barn or shed also needs a building permit, since the County treats it as a change of use that must meet current residential building standards.

Impact fees, briefly

Under Government Code 66311.5, no local agency or special district may charge impact fees on an ADU of 750 sq ft or less, or on a JADU of 500 sq ft or less. Above 750 sq ft, fees must be proportional to the size of the main home. County fee programs, their exemptions and the SB 1117 changes for 2027 are covered in the guide to ADU impact fees in Sacramento County, Elk Grove and Roseville. For your exact parcel, the County points owners to its development impact fee estimate service.

Sewer or septic

Sewer. In sewered parts of the unincorporated County, the sewer agency is SacSewer, the Sacramento Area Sewer District. On January 1, 2024 the former Regional San merged into SacSewer, so one district now handles collection and treatment. The County's service district map places Carmichael, Fair Oaks and Antelope inside the SacSewer service area. State law also limits what a sewer or water agency can charge: a conversion unit or JADU cannot be required to have a separate connection or pay a connection fee (unless it is built together with a new house), and for other units any connection fee must be proportional to the unit's size or plumbing fixtures. SacSewer's residential fees page explains how its impact fees work; request a quote for your parcel.

Septic. Much of rural Wilton sits outside the SacSewer service area on the County's map. Parcels without public sewer rely on a septic system (an OWTS, onsite wastewater treatment system). The County Environmental Management Department's OWTS Guidance Manual is direct about it: a building permit cannot be issued for a project that relies on a new or existing septic system without EMD's prior approval. EMD approval of a plot plan is required when a project adds bedrooms or wastewater flow, or adds structures that could affect any part of the system, including the area reserved for a replacement leach field, so that reserve area can limit where the unit goes. For sizing, the manual treats a second dwelling the same as a full single-family home. Talk to EMD's Liquid Waste Program before you fix a site plan.

Water providers by community

The County's water purveyor map shows several providers, and the right one depends on your street:

  • Carmichael: Carmichael Water District or Sacramento Suburban Water District.
  • Fair Oaks: Fair Oaks Water District, with Citrus Heights Water District serving part of the area.
  • Antelope: California American Water or Sacramento Suburban Water District.
  • Wilton: at sample points in central Wilton the map shows no public water purveyor, so check whether your parcel relies on a private well.

The same state limits on connection fees apply to water agencies. Ask your provider early about service requirements for the new unit.

School district developer fees

School fees are set by each district, and the building permit will not issue until the district signs off. State law, through Government Code 66311.5(c)(3), means an ADU or JADU under 500 sq ft pays no school fee anywhere in California. Some local districts go further:

  • Carmichael and Fair Oaks: San Juan Unified. The district's developer fee page lists $5.38 per sq ft for residential buildings from June 13, 2026, and excludes units under 750 sq ft.
  • Wilton: Elk Grove Unified. The district's Facilities and Planning page lists $7.23 per sq ft for residential from July 1, 2026, and exempts units of 750 sq ft or less.
  • Antelope: depends on the street. The County's school district map shows parts of Antelope in Center Joint Unified, Twin Rivers Unified, San Juan Unified, and Dry Creek Joint Elementary with Roseville Joint Union High. Ask your district for its current rate and policy.

Fire districts and sprinklers

The County's fire district map places Carmichael, Fair Oaks and Antelope in Sacramento Metropolitan Fire District. In the Wilton area, parcels fall in the Wilton Fire Protection District or Cosumnes CSD Fire, depending on location. The fire agency may require its own review, permit and fee, as the Shelf Ready program page notes.

On sprinklers, under Government Code 66314(d)(12), a second unit does not need fire sprinklers if they are not required for the main home, and building one cannot trigger a requirement to add sprinklers to the existing home.

Flood zones near the Cosumnes River

The County's FEMA floodplain layer shows Zone A and Zone AE (100-year floodplain) areas within the greater Wilton area. Check your parcel early, and if it sits in a mapped flood zone, ask the County what floodplain requirements apply before you finalize the design.

City or County: how to tell which rules apply to your address

A mailing address does not tell you which government issues your permit. Two free County tools settle it:

  • The Assessor Parcel Viewer looks up any parcel in the County.
  • The Sacramento County Online Map, which the Planning division also lists as its Interactive Zoning Map, shows the zoning district and whether the area is unincorporated. If the zone is RD (residential), the rules above apply. If it is AR, AG or A, look at the Agricultural Accessory Dwelling rules instead.

If your parcel is inside the City of Sacramento, the City's rules apply instead. For the communities in this guide, see the local pages for Carmichael, Fair Oaks and Antelope.

Plan your County ADU with a local builder

Whether a County lot can take a second unit depends on its zone, its sewer or septic, its water source and its school and fire districts. We can check your parcel against the current County rules, tell you whether it qualifies for an ADU, a JADU or an Agricultural Accessory Dwelling, and map out the permit steps. Call us at (916) 238-8240 or request a free estimate through our ADU services page.

Check Your County Parcel

Not sure if your lot qualifies for an ADU, a JADU or an Agricultural Accessory Dwelling? We can check your parcel against the current Sacramento County rules and map out the permit steps.

We build across the Greater Sacramento area & Central Valley — we don't serve the Bay Area.

By submitting, you consent to receive calls or texts about your project. See our Privacy Policy.

Watch Our Projects on YouTube

ADU and home addition videos from Result Construction in Sacramento.

Visit Our YouTube Channel